Juranda Village

Logo

Juranda Village housing estate

Juranda Village housing estate is located at the intersection of Piasta Kołodzieja and Krzemienna streets in Białołęka district in Warsaw. In the close range from development are located a lot of shops, educational places like creche, kindergartens and primary school, In addition in next to investment it is possible to use sports recreation facility and green areas. Acces to the investment is provided via Ostródzka street or Juranda ze Spychowa street by which is possible to get acces to the expressway S8. If someone use public transport it is possible to use two close to each other bus stops.

Graphical representation of investment surroundings

So far, 16 semi-detached buildings have been completed an put into use 32 apartments. Each of them is individual 3 – level apartment with own garden. If you are decided to buy an apartment you get:

  • – 2 parking places (outdoor – in front of apartment – phase 2). In stage 3 parking one of them is outdoor in front of garage, the second one is in the garage.
  • – Installation for solar panels (we are not selling and mounting them!),
  • – Installation for car charger (at customer request).

In addition apartments are equipped in pump heat, and his another advantage is possibility to individual arrangement 3rd floor.

Front view – visualization – phase 2

Back view from garden – visualisation – phase 2

Front view – visualization – phase 3

Back view from garden – visualisation – phase 3

As a result of cooperation our company with The Newmono are example of possible arrangements of our apartments. we encourage to look at them and get inspirations!

Vertical section

First floor plan

Second floor plan

Attic floor plan

The construction process has been divided into four stages: 1A, 1B, 2A and 2B, each comprising two groups of buildings. Part of the plot has been designated for the construction of a road — Nowokowalskiego Street. Stages 1, 2A and 2B have now been completed, while Stage 3 is currently under construction, with the occupancy permit planned by the end of September 2026.

Stages of Juranda Village Investment

Phase 1 and 2 is finished!

List of apartments:

Phase 2

BuildingApartmentArea of apartment [m²]Price per 1 m² [zł]Total price [zł]Area of garden [m²]StatusEnd day of reservation*Apartment information sheet
JJ1111,9710 270,611 150 00045,90AVAILABLEDownload
LL1112,6410 209,521 150 00044,58AVAILABLEDownload
MM2111,8510 281,631 150 00043,33AVAILABLEDownload
NN1112,2110 248,641 150 00043,19AVAILABLEDownload
PP1112,6010 213,141 150 00043,99AVAILABLEDownload

Phase 3

BuildingApartmentArea of apartment [m²]Price per 1 m² [zł]Total price [zł]Area of garden [m²]StatusEnd day of reservation*Apartment information sheet
AA1114,5912 392,011 420 000140,50RESERVATIONDownload
AA2133,1210 598,601 420 00070,35AVAILABLEDownload
BB1133,1111 667,871 420 00074,45AVAILABLEDownload
BB2112,2012 655,971 420 00086,40AVAILABLEDownload
CC1128,7011 033,411 420 00083,20AVAILABLEDownload

* End day of rezervation (inclusive)

19.04.2026 r – Phase 3 – 1 540 000 zł -> 1 480 000 zł
25.05.2026 r – Phase 3 – 1 480 000 zł -> 1 420 000 zł
19.04.2026 r – Phase 2 – 1 220 000 zł -> 1 150 000 zł

Information about investment:

e-mail: jurandavillage@gmail.com

Sign up for the newsletter

Sign up for the newsletter and receive up-to-date information!

Have Questions?

If you would like to ask question about our services or you would like to cooperate – please contact with us. We are going to answer the questions as soon as possible.

*
Required
*
Required

* required fields